El Paso Solar: El Paso Electric Net Metering, Rates, and Cost (2026)

Isometric El Paso desert neighborhood of adobe homes with rooftop solar panels below the Franklin Mountains under a clear high-desert sky
The 60-second answer for El Paso (as of August 2026)

El Paso runs on El Paso Electric, a regulated utility outside the ERCOT grid, so unlike Houston or Dallas it actually offers rooftop-solar net metering. El Paso’s high-desert sun is among the best in Texas, and El Paso Electric’s regulated residential rate is roughly 10.9 to 13.9 cents per kWh (as of August 2026).

  • Your utility is El Paso Electric, and it is not part of ERCOT. El Paso Electric serves far West Texas in the Western Interconnection (WECC), outside the deregulated ERCOT market that covers most of the state (Texas Comptroller, ERCOT overview, as of August 2026).
  • El Paso Electric offers real net metering, which most of Texas does not. For residential distributed-generation customers, El Paso Electric credits the solar you export, applied within your rate’s time-of-day periods (El Paso Electric Texas residential tariff, as of August 2026). Confirm your exact export credit before you size a system.
  • The high-desert sun is excellent. A 6 kW system in El Paso produces about 10,900 kWh in its first year, a strong 20.7% capacity factor (NREL PVWatts, ZIP 79901, as of August 2026).
  • Texas exempts the added home value from property tax. The value solar adds to your home is exempt from Texas property tax, and Texas has no state income-tax credit because it has no state income tax (DSIRE Texas, as of August 2026). Verify current terms.
  • El Paso permits solar through the City’s One Stop Shop. You pull a building and electrical permit through the City of El Paso, then pass a final electrical inspection before El Paso Electric sets your meter (City of El Paso Planning and Inspections, as of August 2026).
  • The 30% federal homeowner credit (Section 25D) ended after December 31, 2025 (IRS, as of January 1, 2026), so an El Paso homeowner who buys solar in 2026 cannot claim it.

El Paso sits in a rare corner of Texas for rooftop solar, and the reason is who keeps the lights on. Most of the state runs on the deregulated ERCOT grid, which has no statewide net metering. El Paso does not. Here your power comes from El Paso Electric, a traditional regulated utility in the Western Interconnection, and that regulated status is exactly why El Paso homeowners get a utility solar-credit program their neighbors in Houston and Dallas do not. Pair that with some of the strongest sunlight in the country, and the local math is genuinely different. This page covers who your utility is, how El Paso Electric credits your solar, what a system produces in the high desert, how El Paso permitting works, and how to check your own address in about a minute.

Isometric El Paso desert neighborhood of adobe homes with rooftop solar panels below the Franklin Mountains under a clear high-desert sky
El Paso solar at a glance The detail (as of August 2026)
Electric utility El Paso Electric, a regulated utility in WECC, outside ERCOT
Net metering Yes, a utility distributed-generation credit (verify terms)
Residential rate About 10.9 to 13.9 cents per kWh
Production (6 kW) About 10,900 kWh in year one (PVWatts, ZIP 79901)
Permitting City of El Paso One Stop Shop, then El Paso Electric meter set
Federal 25D credit Ended after December 31, 2025 (IRS)

Why El Paso is different from the rest of Texas solar

The single most important solar fact in El Paso is that you are not on the ERCOT grid. ERCOT, the grid that covers roughly 90% of Texas load, is deregulated and has no statewide net-metering mandate, which is why solar owners in most of Texas get little or nothing for the power they export. El Paso Electric operates in the Western Interconnection (WECC), outside ERCOT, as a regulated, vertically integrated utility (Texas Comptroller, ERCOT overview, as of August 2026). Because a state-regulated utility sets your rate and your solar tariff, El Paso Electric runs an actual net-metering program, and that changes the payback story compared with the rest of the state. For the statewide picture, see our Texas solar guide.

The other half of the El Paso advantage is the sun. El Paso’s high desert gets about 6.6 kWh per square meter per day of solar resource, near the top for the United States, so a given system produces more here than the same system would in most of the country (NREL PVWatts, ZIP 79901, as of August 2026). For context, El Paso Electric’s regulated residential rate runs roughly 10.9 cents per kWh in the non-summer months and up to about 13.9 cents per kWh on summer usage above the first 600 kWh (El Paso Electric Texas residential tariff, as of August 2026). That is below the roughly 16.4 cents per kWh Texas residential average that reflects the deregulated ERCOT market (EIA Electric Power Monthly, May 2026), so in El Paso the case for solar leans on strong production and real net metering more than on sky-high rates.

Diagram contrasting deregulated ERCOT Texas with El Paso Electric, a regulated utility that offers rooftop solar net metering via a two-way meter

Here is our own read of the El Paso numbers. According to MySolarFY’s analysis (August 2026), a 6 kW system in El Paso produces about 10,900 kWh in its first year (NREL PVWatts, ZIP 79901), which at El Paso Electric’s 2026 residential rate of roughly 10.9 to 13.9 cents per kWh offsets about $1,200 to $1,500 of grid electricity in year one, before you count the value of what you export back under net metering. Your own figure depends on your roof’s pitch, shading, and orientation, so estimate your specific roof with the free PVWatts calculator rather than a generic number.

Free eligibility check

See what solar programs are available in your El Paso ZIP code

El Paso Electric’s net-metering credits, installer availability, and rates change by location. Enter your ZIP and we’ll match you with licensed installers who serve your area.



Free to check. About a minute. No credit pull to check.

Submitted securely and used to match you with licensed installers in your area. Some homeowners may qualify for $0-up-front lease/PPA options where available.

How El Paso Electric credits your rooftop solar

El Paso Electric runs a distributed-generation billing program, which is the piece most of Texas lacks. When you enroll as a residential distributed-generation customer, El Paso Electric meters the solar you export and credits it, applied within the time-of-day periods of your rate rather than at a single flat retail number (El Paso Electric Texas residential tariff, as of August 2026). Because the credit follows your rate’s time buckets, the exact value depends on when your panels send power to the grid and which rate you are on. For the mechanics of how utility credits work, see our explainer on how net metering credits your solar exports.

The practical takeaway is to verify the current terms before you sign. Utility tariffs change, and the export credit, any monthly netting or rollover, and interconnection fees are all set by El Paso Electric’s filed rate schedule, not by the installer selling you the system. Ask your installer to model your bill on El Paso Electric’s current residential distributed-generation tariff and to size the system close to your annual usage, so most of your production offsets power you would otherwise buy rather than being credited at a lower export value. Confirm the details directly with El Paso Electric or the Public Utility Commission of Texas before you commit.

Solar factor El Paso (El Paso Electric) Most of Texas (ERCOT)
Grid Western Interconnection (WECC), regulated utility ERCOT, deregulated retail market
Net metering Yes, a utility distributed-generation credit (verify terms) No statewide mandate; varies by retail plan
Residential rate About 10.9 to 13.9 cents per kWh (as of August 2026) About 16.4 cents per kWh average (EIA, May 2026)

What solar produces and costs in El Paso’s high desert

El Paso’s climate is a real advantage that shows up in your production numbers. A 6 kW system in ZIP 79901 makes about 10,900 kWh in its first year at a 20.7% capacity factor, on roughly 6.6 kWh per square meter per day of sunlight (NREL PVWatts, as of August 2026). That is well above what the same panels would make in a cloudier state, so El Paso homeowners can often meet a large share of their annual usage with a modestly sized system. Because output scales with your roof, run your own address through PVWatts before you size anything.

Cost depends on the system, the equipment, and how you pay. There is no single price for El Paso solar, and any honest estimate has to reflect your roof, your usage, and current equipment pricing rather than a headline number. For how Texas solar pricing and payback break down, see our Texas solar cost guide, and for the incentives that still apply in 2026 see our Texas solar incentives guide. The most reliable way to get a real number is a quote from a licensed installer who serves El Paso and knows the El Paso Electric tariff.

El Paso solar permitting and interconnection

El Paso handles rooftop solar through the City’s permitting process, then El Paso Electric sets your meter. You submit a building permit and an electrical permit through the City of El Paso’s One Stop Shop and online Citizen Access Portal, typically with a site and roof plan, an equipment layout, and a single-line electrical diagram (City of El Paso Planning and Inspections, as of August 2026). After the install, the city’s authority having jurisdiction does a final electrical inspection, and only then does your installer request El Paso Electric’s field inspection and meter set. Your system should not operate until El Paso Electric grants permission to operate, so build a few weeks into your timeline for permit review, inspection, and the utility meter swap.

El Paso and Texas solar incentives in 2026

Texas keeps solar cost down mainly through a property-tax exemption, not a check. The added value that solar brings to your home is exempt from Texas property tax, so improving your home with solar does not raise your property-tax bill, and Texas has no state solar income-tax credit because the state has no personal income tax (DSIRE Texas, as of August 2026). Verify the current terms, since tax rules change.

The federal homeowner credit is the big change for 2026. The 30% federal Residential Clean Energy Credit (Section 25D) ended for expenditures made after December 31, 2025, under the 2025 federal budget law, so an El Paso homeowner who buys solar with cash or a loan in 2026 cannot claim it (IRS, as of January 1, 2026). A separate business credit, Section 48E, can apply to leased and power-purchase-agreement systems, but the company that owns the system claims it, not the homeowner. El Paso Electric’s net metering and the Texas property-tax exemption were not affected, so the local payback case still stands on its own.

Frequently asked questions about El Paso solar

Common questions from El Paso homeowners, answered with the current, verified details.


Reviewed by the MySolarFY team. Figures were verified against the linked El Paso Electric, EIA, NREL PVWatts, City of El Paso, DSIRE, and IRS sources as of August 2026. El Paso Electric’s rates and distributed-generation terms, the Texas property-tax exemption, and El Paso permitting steps can change, so confirm current terms with El Paso Electric, the Public Utility Commission of Texas, and the City of El Paso before you decide. MySolarFY does not provide tax or financial advice; consult a licensed professional about your own situation. Learn more about the MySolarFY team and how we work.

MySolarFY is a free service that matches homeowners with licensed solar installers. We are not an installer, financing company, or government program. “No up-front cost” refers to qualifying lease or power-purchase-agreement financing, where eligible homeowners may have no out-of-pocket cost at installation. Lease and PPA terms typically run 20 to 25 years, may include an annual price escalator, and total payments may exceed the cost of a cash purchase; on a lease or PPA the tax benefits and any credits go to the company that owns the system, not the homeowner. Homeowners do not get the federal residential credit that ended after December 31, 2025. Solar panels are not free and monthly payments apply. Eligibility, savings, incentives, and rates vary and are not guaranteed. See our full disclaimer.

Check My Eligibility